Ellis Drafting Logo Ellis Drafting
Instant Quote
New York • AIA G202 & SMACNA LOD 400

New York MEP BIM Coordination & LOD 400 Detailing

Fabrication-grade Revit modeling, SMACNA duct spooling, and Navisworks clash coordination for commercial trade subcontractors across the New York metro area.

Calculate New York Project Cost Contact Engineering Team
Native BIM Standards:
Autodesk Revit 2022–2025 • Navisworks Manage • AIA G202 & SMACNA LOD 400

Technical Deliverables & Scope

LOD 400 Fabrication Spooling

Field-verified pipe spool cut sheets, victaulic coupling tags, and ductwork shop fabrication tickets.

Hard & Clearance Clash Resolution

Multi-trade Navisworks coordination resolving conflicts between HVAC, plumbing risers, and structural framing.

Sleeve & Core Hole Coordination

Deck sleeve layout sheets and robotic total station (Trimble RTS) coordinate exports.

SMACNA & IPC Compliance

Duct construction classifications, pipe hanger spacings, and plumbing layout compliant with NYC Building Code.

Frequently Asked Technical Questions

Do you follow AIA and SMACNA drafting standards for US projects? +

Yes. We model strictly in accordance with AIA G202-2020 BIM protocols, BIMForum LOD 350/400 development specifications, and SMACNA duct construction standards.

Can you provide spool drawings ready for shop fabrication in the US? +

Yes. We produce complete spool sheets with pipe roll angles, fitting callouts, and automated bill of materials tailored for pre-fab workshops.

What is your turnaround for high-density commercial fit-outs? +

We turn around coordinated shop drawings and clash resolutions in 48 to 72 hours, helping mechanical subs stay ahead of concrete pour schedules.

Need Coordinated Drawings in New York?

Send us your architectural backgrounds, single-line schematics, or equipment schedules for an immediate review and fixed-fee estimate.

Launch Project Estimator Open Interactive 3D Model